Machines wait for material, for tooling, for the previous station; work orders wait for a machine or a decision. That time produces nothing, never shows up in reports, and eats into delivery dates and capacity every day. ManuFlow runs scheduling as a repeating cycle of plan, do, check and act, so the schedule keeps correcting itself against what is really happening on the shop floor.
Typical scheduling Machines idle, work orders queue
After ManuFlow reschedules Idle gaps closed, delivery earlier
What happens to the schedule when a rush order comes in, a due date changes or a machine breaks down. The video walks you through it.
The video plays on YouTube.Open on YouTube →
How many of these sound familiar?
If you recognise even one, ManuFlow can help.
Validated with customer shop-floor data. None of these three numbers appears in your financial statements. Multiply them by your revenue: what do they add up to?
Time when a machine or work order is “waiting” and creating no value. It hides in every changeover, every inserted rush order, and every work order stuck behind an unfinished earlier step.
The previous station isn't finished, so the next machine sits idle.
Workpieces pile up between stations waiting for a busy machine.
Molds or fixtures are in use, or changeovers are frequent, so equipment just waits.
A rush order arrives and the floor stops while a manager decides how to fit it in.
When molds or fixtures are busy, it finds the next feasible time slot so machines don't sit stuck.
Orders with similar features run back to back, cutting changeover waiting.
See who is holding a machine and which orders have slack, find idle machines and fill them with work.
Trial-schedule inquiries in a simulation first, see the impact, then decide, instead of waiting for answers from the floor.
Waiting doesn't show in reports; you have to see it before you can remove it. Based on customer shop-floor data, changeovers consume about 5–20% of equipment capacity.
A plan starts drifting from the shop floor the moment it is published. Put scheduling into this cycle and each round brings the plan closer to reality.
Enter your plant's rough size and, based on what we've validated at customer sites, estimate the impact of schedule misses.
Want to keep this estimate to compare later?
We only use this to send you the estimate and follow up. See the privacy policy (Chinese).
Estimated from what we've validated at customer sites: about 55% of rush-order delivery promises miss, changeovers consume about 5–20% of equipment capacity, and about 75% of production plans are achieved. Actual results depend on each plant; this estimate is for reference only.
One click gives a delivery date you can actually meet, so you see the result before promising a customer.
Finds idle machines and raises utilization, so bottlenecks show up before they jam.
Open a simulated order and trial-schedule a routing first, see the impact, then decide whether to accept.
Continuous correction:production reports write back automatically, and as soon as the floor deviates it helps reschedule, so the plan always follows reality.
Tick the work orders to release, choose a scheduling strategy and send; utilization, late rate and total duration appear in seconds. Late orders are visible at a glance.
| Version | Utilization | Late rate | Total duration |
|---|---|---|---|
| V1 Earliest due date | 68% | 6.1% | 24 days |
| V2 Fewest pieces | 71% | 5.6% | 23 days |
| V3 AI suggestion | 73% | 4.8% | 22 days |
The scheduling engine works like a navigation system avoiding traffic: it routes around unavailable time so new orders are built on capacity that is really available.
As soon as sales receives an inquiry, they open a simulated order, draw or adjust its routing and trial-schedule it at once. They see the expected completion and the impact on the existing schedule, then decide whether to accept and what date to quote.
| Simulated order | |
|---|---|
| Part no. / quantity | A-2031 / 500 pcs |
| Requested date | 11/20 |
Turning moved to Machine C, 1.5 h per batch, then trial-scheduled again.
| Trial result | |
|---|---|
| Expected finish | 11/18, meets the due date |
| Existing orders whose schedule changes | 0 orders |
Contention analysis: 7 work orders occupy 8.4 hours in total; 2 of them have slack, so their priority can be adjusted.
Late — who is holding the machine? Right-click the late step to see who occupies the equipment and which orders can wait a little.
Automatically groups orders with similar features to run together and cut changeovers; when delivery is tight, only the specific work orders work overtime, not the whole plant.
| Scenario | Late orders |
|---|---|
| Standard shifts | 3 orders |
| Overtime for specific orders, 2 h/day | 0 orders |
See it and change it. Drag blocks to link steps and assign which machines can run each station; for new products or steps, draw the routing first and trial-schedule it.
When a simulation shows a late order, it proactively suggests fixes such as splitting the batch, moving part of the work to a backup machine or changing closing priority, and you can ask in plain language why it is late.
ManuFlow is the scheduling application on the GoEdge platform, and your company's AI assistant can ask it about the schedule directly. The ManuFlow AI assistant comes in three editions, from understanding the schedule to producing a plan from a single sentence.
AI builds the best schedule, and Gantt and load charts show bottlenecks at a glance.
Ask about schedule results in plain text; the AI explains the reason and gives advice.
“Why is MO-2205 going to be late?”
“What should we change next week to stay on time?”
Give one instruction and the scheduling AI assistant produces a plan for you to confirm.
“Insert a rush order, and customer B must not be delayed” → it compares 3 versions and recommends one; nothing takes effect until you press “Apply”.
Measured results from one machining plant and the same batch of 230 work orders.
Results come from a single plant and a single period, and the two ways of inserting the rush order are a simulated comparison in the system. Actual results depend on each plant's work orders, equipment and shift calendars.
Column names and order don't need to change; missing fields are filled in through interviews.
Turn long-held experience into rules the system can calculate.
Hands-on practice on site, then official use after acceptance.
Who does the work and when they are available
Which workstations exist
How each product is made
The work orders to make right now
Subcontracted work is treated as a kind of “resource” in the schedule.
ManuFlow is a standard software product. After you obtain a license it is deployed in your own environment, and you keep benefiting from version updates.
Get the right to use the ManuFlow software and scheduling algorithms. Single-machine license on an annual subscription, including version updates and technical support.
Installed on your own servers and network, so data stays in the plant and under your control. Equipment and system environment are provided by the customer.
Our experts come on site to help import data and set rules, and complete one day of system training and installation; after acceptance you go live.
The license is based on the number of machines and resources, work-order volume and routing size; expand it when capacity grows.
Data connection to ERP, MES and production-reporting systems, and the AI decision assistant (with a dedicated AI server).
ManuFlow is installed in your own environment, the equipment is supplied by the customer, and you keep control of your data.
Yes. Prepare four basic data sets (resources and calendars, processes, routings, work orders) and you can start; production-report write-back can be connected later.
Subcontracted work is treated as a resource and included in the schedule calculation.
Manufacturers with high variety, small batches and frequent rush orders, such as machining, injection molding, stamping, electronics assembly, PCB and machine tools.
By the number of machines and resources, work-order volume and routing size, and it can grow with the plant. Book a conversation for details.
It depends on how complete your data is and how much is connected. Book a conversation and a specialist will assess it for you.
Book a dedicated ManuFlow demo and see how it applies to your plant's scheduling.