GoEdge platform application | ManuFlow scheduling

Take idle waiting out of your schedule

Machines wait for material, for tooling, for the previous station; work orders wait for a machine or a decision. That time produces nothing, never shows up in reports, and eats into delivery dates and capacity every day. ManuFlow runs scheduling as a repeating cycle of plan, do, check and act, so the schedule keeps correcting itself against what is really happening on the shop floor.

Find idle waitingKeep the schedule correcting itselfTrial-schedule rush orders

Typical scheduling Machines idle, work orders queue

Machine B
WO 1002IdleWO 1005Idle1008
Machine C
WO 1003IdleWO 1006

After ManuFlow reschedules Idle gaps closed, delivery earlier

Machine B
WO 1002WO 10051008
Machine C
WO 1003WO 1006Trial run
On timeIdle waitingLateDue date
Illustration (sample data)
Demo

See how ManuFlow schedules in 3 minutes

What happens to the schedule when a rush order comes in, a due date changes or a machine breaks down. The video walks you through it.

The video plays on YouTube.Open on YouTube →

Does your factory look like this?

How many of these sound familiar?

Orders keep getting smaller and more varied

The number of part numbers has multiplied in five years

Rush orders and cancellations are more and more frequent

Still scheduling in Excel

MachiningInjection moldingStampingElectronics assemblyPCBMachine tools

If you recognise even one, ManuFlow can help.

Three hidden costs that hit every day

~55%Delivery promises that miss
Rush orders accepted by gut feeling
5–20%Capacity lost to changeovers
Frequent stoppages, capacity lost for nothing
~75%Production plan attainment
One order in four is a fire drill

Validated with customer shop-floor data. None of these three numbers appears in your financial statements. Multiply them by your revenue: what do they add up to?

Idle Time

What is idle waiting?

Time when a machine or work order is “waiting” and creating no value. It hides in every changeover, every inserted rush order, and every work order stuck behind an unfinished earlier step.

Up to 40%
of manufacturing cycle time is non-production timeFrom field data at customer cases. During this time the workpiece is not being processed; making it visible and removing it is where ManuFlow starts.
1

Machine waits for material

The previous station isn't finished, so the next machine sits idle.

2

Work orders queue

Workpieces pile up between stations waiting for a busy machine.

3

Waiting for molds, fixtures and changeovers

Molds or fixtures are in use, or changeovers are frequent, so equipment just waits.

4

Waiting for a decision

A rush order arrives and the floor stops while a manager decides how to fit it in.

How ManuFlow removes it

Automatically avoids blockages

When molds or fixtures are busy, it finds the next feasible time slot so machines don't sit stuck.

Batch grouping

Orders with similar features run back to back, cutting changeover waiting.

Contention analysis

See who is holding a machine and which orders have slack, find idle machines and fill them with work.

Trial-schedule rush orders

Trial-schedule inquiries in a simulation first, see the impact, then decide, instead of waiting for answers from the floor.

Waiting doesn't show in reports; you have to see it before you can remove it. Based on customer shop-floor data, changeovers consume about 5–20% of equipment capacity.

PDCA

Scheduling isn't done once: it is a cycle of plan, do, check and act that keeps turning

A plan starts drifting from the shop floor the moment it is published. Put scheduling into this cycle and each round brings the plan closer to reality.

P Plan: scheduleOne-click scheduling, side-by-side versions and trial scheduling of rush orders: see the delivery date and the impact first, then commit.
→
D Do: executeDispatch to the floor; production reports write back automatically, no manual data entry.
→
C Check: reviewCompare plan and actual: contention analysis, utilization and delivery-risk alerts, all in one view.
→
A Act: adjustAs soon as a deviation appears, help reschedule: change priorities, freeze started orders, simulate overtime, and reschedule only the free space.

↺ Each round shows waiting more clearly and leaves less of it, so the plan always follows reality.

Calculator

Try it: how many deliveries are at risk each month?

Enter your plant's rough size and, based on what we've validated at customer sites, estimate the impact of schedule misses.

Delivery promises likely to miss11orders/month

Machine hours lost to changeovers176–704hours/month

Work orders needing fire-fighting to recover50orders/month

Want to keep this estimate to compare later?

We only use this to send you the estimate and follow up. See the privacy policy (Chinese).

Estimated from what we've validated at customer sites: about 55% of rush-order delivery promises miss, changeovers consume about 5–20% of equipment capacity, and about 75% of production plans are achieved. Actual results depend on each plant; this estimate is for reference only.

ManuFlow in one sentence

1

Calculates delivery dates

One click gives a delivery date you can actually meet, so you see the result before promising a customer.

2

Finds capacity

Finds idle machines and raises utilization, so bottlenecks show up before they jam.

3

Absorbs rush orders

Open a simulated order and trial-schedule a routing first, see the impact, then decide whether to accept.

How it works: from data to decisions

Data foundationERP order sync, MES production reports, work orders, routings, resource calendars
→
ManuFlow AI brainScheduling that avoids blockages, simulated orders and routing trials, AI decision suggestions
→
Smart operationsLive Gantt dashboard, accurate delivery forecasts, proactive alerts on exceptions

Continuous correction:production reports write back automatically, and as soon as the floor deviates it helps reschedule, so the plan always follows reality.

Features

01

One-click scheduling and version comparison

Tick the work orders to release, choose a scheduling strategy and send; utilization, late rate and total duration appear in seconds. Late orders are visible at a glance.

  • Earliest due date first, shortest time first, smallest quantity first, lowest complexity first
  • Compare several versions side by side and dispatch the best one
  • Edit priorities of dozens of work orders in bulk
VersionUtilizationLate rateTotal duration
V1 Earliest due date68%6.1%24 days
V2 Fewest pieces71%5.6%23 days
V3 AI suggestion73%4.8%22 days
Sample data
MonTueWedThuFri
Machine A
WOMaint.WOOff
Machine B
FrozenWO
Illustration (sample data)
02

Automatically avoids blockages

The scheduling engine works like a navigation system avoiding traffic: it routes around unavailable time so new orders are built on capacity that is really available.

  • Automatically skips lunch breaks, shift changes and public holidays
  • Avoids equipment maintenance and repair windows
  • When molds or fixtures are busy, finds the next feasible time slot
  • Orders already started or of high priority can be frozen so only free space is rescheduled
03

Rush-order trial scheduling: try before you promise

As soon as sales receives an inquiry, they open a simulated order, draw or adjust its routing and trial-schedule it at once. They see the expected completion and the impact on the existing schedule, then decide whether to accept and what date to quote.

  • Open a simulated order: enter part number, quantity and requested date and calculate inside the simulation, without touching the existing schedule
  • Draw and adjust the routing: add or remove steps, change machines or times to match how this order will really be made
  • Trial schedule for the date: expected finish and which orders get squeezed, all in one view
  • Compare strategies: apply different routings or strategies to the same simulated order and pick the best
Simulated order
Part no. / quantityA-2031 / 500 pcs
Requested date11/20
Routing
BlankingTurningHeat treatGrindingInspection

Turning moved to Machine C, 1.5 h per batch, then trial-scheduled again.

Trial result
Expected finish11/18, meets the due date
Existing orders whose schedule changes0 orders
Illustration (sample data)
Machine B
Late ordersRival WO 1Rival WO 2

Contention analysis: 7 work orders occupy 8.4 hours in total; 2 of them have slack, so their priority can be adjusted.

Illustration (sample data)
04

Contention analysis and bottleneck alerts

Late — who is holding the machine? Right-click the late step to see who occupies the equipment and which orders can wait a little.

  • Find competing work orders with slack and adjust priority so the late order catches up
  • Check utilization of each workstation and machine, and see bottlenecks early
  • Find idle machines, go and find work for them, raise utilization
05

Batch grouping and overtime simulation

Automatically groups orders with similar features to run together and cut changeovers; when delivery is tight, only the specific work orders work overtime, not the whole plant.

  • Define your own batch groups by material, mold or tool specification
  • Minimise changeover and setup losses and improve overall equipment effectiveness
  • Set overtime windows and weekly limits per machine and see at once whether delivery can be recovered
ScenarioLate orders
Standard shifts3 orders
Overtime for specific orders, 2 h/day0 orders
Sample data
Routing
BlankingMillingHeat treatInspection
Illustration (sample data)
06

Routing and production reporting board

See it and change it. Drag blocks to link steps and assign which machines can run each station; for new products or steps, draw the routing first and trial-schedule it.

  • Copy an existing work order's routing in one click and adjust it
  • Production reports come back in real time to compare plan against actual
  • Delivery-risk alerts, with exceptions caught within seconds
Optional add-on

AI decision assistant

When a simulation shows a late order, it proactively suggests fixes such as splitting the batch, moving part of the work to a backup machine or changing closing priority, and you can ask in plain language why it is late.

ManuFlow AI assistant in three stages

ManuFlow is the scheduling application on the GoEdge platform, and your company's AI assistant can ask it about the schedule directly. The ManuFlow AI assistant comes in three editions, from understanding the schedule to producing a plan from a single sentence.

Basic edition

See it

AI builds the best schedule, and Gantt and load charts show bottlenecks at a glance.

Professional edition

Ask it

Ask about schedule results in plain text; the AI explains the reason and gives advice.

“Why is MO-2205 going to be late?”
“What should we change next week to stay on time?”

Platinum edition

Get it done

Give one instruction and the scheduling AI assistant produces a plan for you to confirm.

“Insert a rush order, and customer B must not be delayed” → it compares 3 versions and recommends one; nothing takes effect until you press “Apply”.

Results

Measured results from one machining plant and the same batch of 230 work orders.

0 ordersExisting work orders delayed by the rush order
One rush order of 500 pieces was inserted; start and finish times of all 230 existing work orders did not change at all
81 days earlyCompletion of the rush order
Placed into gaps in machine time, finishing 81 days before the date the customer asked for
14 → 13 ordersLate work orders
By changing priorities only, with everything else unchanged, on-time completion went from 93.9% to 94.3%

Same rush order, the difference is whether you trial-schedule first

No trial scheduling

Put the rush order at the front of the queue

  • One work order that could have finished the same day was pushed back by almost a month
  • Another work order finished more than three weeks late
  • One more went from on time to late
Trial-schedule first with ManuFlow

Lock the existing schedule and only use gaps

  • All 230 existing work orders stay untouched, and dispatch sheets already issued remain valid
  • The rush order fits into machine gaps and finishes 81 days before the due date
  • You can accept this rush order directly, without sacrificing an existing customer's delivery date

Results come from a single plant and a single period, and the two ways of inserting the rush order are a simulated comparison in the system. Actual results depend on each plant's work orders, equipment and shift calendars.

Getting started is simple: export from ERP as-is

Export your data

Column names and order don't need to change; missing fields are filled in through interviews.

Expert diagnosis on site

Turn long-held experience into rules the system can calculate.

Training and go-live

Hands-on practice on site, then official use after acceptance.

Only four sets of data are needed (Excel or CSV; we handle the column mapping)

Resources and calendars

Who does the work and when they are available

Processes

Which workstations exist

Routing

How each product is made

WO

The work orders to make right now

Subcontracted work is treated as a kind of “resource” in the schedule.

License

How to buy: software license installed in your plant

ManuFlow is a standard software product. After you obtain a license it is deployed in your own environment, and you keep benefiting from version updates.

1

Product license

Get the right to use the ManuFlow software and scheduling algorithms. Single-machine license on an annual subscription, including version updates and technical support.

2

Installed inside your plant

Installed on your own servers and network, so data stays in the plant and under your control. Equipment and system environment are provided by the customer.

3

Quick onboarding

Our experts come on site to help import data and set rules, and complete one day of system training and installation; after acceptance you go live.

License size grows with your plant

The license is based on the number of machines and resources, work-order volume and routing size; expand it when capacity grows.

Optional modules

Data connection to ERP, MES and production-reporting systems, and the AI decision assistant (with a dedicated AI server).

FAQ

Does my data leave the plant?

ManuFlow is installed in your own environment, the equipment is supplied by the customer, and you keep control of your data.

Can I use it without an MES?

Yes. Prepare four basic data sets (resources and calendars, processes, routings, work orders) and you can start; production-report write-back can be connected later.

How is subcontracting handled?

Subcontracted work is treated as a resource and included in the schedule calculation.

Which industries is it for?

Manufacturers with high variety, small batches and frequent rush orders, such as machining, injection molding, stamping, electronics assembly, PCB and machine tools.

How is the license calculated?

By the number of machines and resources, work-order volume and routing size, and it can grow with the plant. Book a conversation for details.

How long does onboarding take?

It depends on how complete your data is and how much is connected. Book a conversation and a specialist will assess it for you.

Make scheduling more than a static spreadsheet: a helper that removes idle waiting and keeps correcting itself

Book a dedicated ManuFlow demo and see how it applies to your plant's scheduling.